{"id":58,"date":"2020-09-08T13:52:24","date_gmt":"2020-09-08T11:52:24","guid":{"rendered":"http:\/\/wordpress.p569325.webspaceconfig.de\/?p=58"},"modified":"2021-01-06T10:53:48","modified_gmt":"2021-01-06T09:53:48","slug":"foundation-stone-laid-for-new-moteg-production-site","status":"publish","type":"post","link":"https:\/\/www.moteg.de\/en\/2020\/09\/foundation-stone-laid-for-new-moteg-production-site\/","title":{"rendered":"Foundation stone laid for new MOTEG production site"},"content":{"rendered":"<p>[vc_row row_height_percent=&#8221;0&#8243; override_padding=&#8221;yes&#8221; h_padding=&#8221;2&#8243; top_padding=&#8221;4&#8243; bottom_padding=&#8221;4&#8243; overlay_alpha=&#8221;50&#8243; gutter_size=&#8221;3&#8243; column_width_percent=&#8221;100&#8243; shift_y=&#8221;0&#8243; z_index=&#8221;0&#8243; shape_dividers=&#8221;&#8221;][vc_column column_width_use_pixel=&#8221;yes&#8221; gutter_size=&#8221;3&#8243; overlay_alpha=&#8221;50&#8243; shift_x=&#8221;0&#8243; shift_y=&#8221;0&#8243; shift_y_down=&#8221;0&#8243; z_index=&#8221;0&#8243; medium_width=&#8221;0&#8243; mobile_width=&#8221;0&#8243; column_width_pixel=&#8221;1100&#8243;][vc_column_text]<\/p>\r\n<p><strong>09\/2020 &#8211;\u00a0<\/strong><strong>Handewitt<\/strong><\/p>\r\n<p>At the beginning of September, the foundation stone was laid for MOTEG&#8217;s new production hall in Handewitt near Flensburg. This is where MOTEG&#8217;s e-motors, electric compressors and power steering pumps will be produced and built from spring 2021. Compared with the existing production site, this will triple MOTEG&#8217;s production capacity to up to 50,000 units per year, thus meeting rising customer demand.<\/p>\r\n<div class=\"lmt__inner_textarea_container\">\r\n<p>From the fall of 2021, MOTEG&#8217;s development, management and all other departments will also be relocated to the new site. For this purpose, the construction of an additional building will take place on the site from spring 2021.<\/p>\r\n<\/div>\r\n<p>\u00a0<\/p>\r\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>","protected":false},"excerpt":{"rendered":"<p>Anfang September fand die Grundsteinlegung f\u00fcr die neue Produktionshalle der MOTEG in Handewitt in der N\u00e4he Flensburgs statt. Hier sollen ab Fr\u00fchjahr 2021 die Motoren sowie elektrischen Kompressoren und Lenkhilfepumpen der MOTEG produziert und gebaut werden.<\/p>\n","protected":false},"author":2,"featured_media":651,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/posts\/58"}],"collection":[{"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/comments?post=58"}],"version-history":[{"count":7,"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/posts\/58\/revisions"}],"predecessor-version":[{"id":1676,"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/posts\/58\/revisions\/1676"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/media\/651"}],"wp:attachment":[{"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/media?parent=58"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/categories?post=58"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moteg.de\/en\/wp-json\/wp\/v2\/tags?post=58"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}